Register  |  Login
 
Site Sponsor
Planning for the worst
but hoping for the best

hazmathood_logo
img
Project ARGUS Events
Be Prepared for Terrorism CBRN, Pandemic and natural disaster.Apply the Project Argus message to your existing contingency plans or develop Business Continuity and contingency plans from our "Free" training and templates.



We are pleased to present the government counter terrorist initiative "Project Argus" in association with a full days training and group workshop. Project Argus will form the basis of the days training with a simulated attack designed to promote measures you can take for preventing, handling and recovering from a terrorist attack and natural or accidental disruptive event. For more details Click here
Course >> Vulnerability >> Assessments >> Security Management
Security Management and Control
Physical controls Strict control of people movements into and out of the enterprise
Vehicular management Vehicles should be thoroughly controlled to identify basis of delivery and prevent unauthorised parking
Incoming deliveries and mail All deliveries should be positively identified or from known and usually accepted sources. Specific mail threats should be identified and procedures put in place
Waste and receptacle procedures Waste and rubbish should be protected in secure areas, that also prevent fire or emanating smoke spreading into the building
Lock down and trespasser arrangements Management systems should be in place to lock down the building/complex and individual sections to prevent either access or egress
Designated limits of authority Identified staff or duty holders should be trained and be aware of written limits of authority and levels of restraint and/or controls
Integrated security advice Monitoring should be integrated and be available for instant down load or email to authorised parties